国产91home牛牛91在线91porn免费在线观看王受文:支持对世贸组织进行改革 坚持开放政策取向

發布時間︰

  長平再次問老宮女。   “濟北王死了,大雨就停了,現在就等東海官員稟報東海大魚浮尸海上的消息。”国产91home   琉璃珠子就是雲氏琉璃作坊里生產的,雲哲身為雲氏長子,哪里會少什麼琉璃珠子。牛牛91在线   霍去病不解的道︰“濟北王在濟水北邊啊。”   可是,肝腸寸斷歸肝腸寸斷,利用出賣歸利用出賣,該出手的時候她不會猶豫。91porn免费在线观看   雲瑯很想說如果沒有雲氏防彈馬車保護,你這時候早就被狙殺了,只是周圍圍觀者甚多,只好點頭道︰“再送先生一輛就是了。”
Previous Next

project at a glance

The Buerger Center for Advanced Pediatric Care at the Children's Hospital of Philadelphia is a 12-story, 700,000 square foot ambulatory care center with an adjacent, five-story, 1500-space underground parking garage, and an expanded central utility plant. The Center houses various ambulatory care clinics supporting outpatient diagnostics and specialty care services.  It is located beside the Colket Translational Research Building, which was also built by Turner.

Turner performed one of the largest excavations of its kind in the city of Philadelphia in order to prepare this site for the facility. Over the course of the nine-month excavation, the team excavated 70 feet down and hauled out roughly 300,000 cubic yards of rock.

In addition to building a world-class pediatric care facility, the project involved the construction of the largest green roof in Philadelphia, a sprawling 3-acre landscaped plaza.  Constructed on the roof level of the parking garage, the plaza incorporates local trees, shrubs, and flowering plants as well as four separate water fountains to create a setting that rivals a botanical garden.  The plaza alone took nearly 145,000 man-hours to complete and includes 166 trees, 3,635 shrubs, 16,366 perennials, 6,000 cubic yards of planting soil and stone mix, 30,000 square feet of stone pavers, and 10,000 square feet of stone cladding.

The project  achieved LEED Gold certification.

View this project in Turner City 2015.

Make a 3D print of the Buerger Center for Advanced Pediatric Care.

For Services / Specializations
and Additional Key Contacts
See Office Network

*Office includes a Special
Projects Division or Interiors
Group